Atul Punj was the Chairman of Punj Lloyd, a diversified conglomerate and the second largest company in India, providing engineering and construction services in Energy and Infrastructure, with interests in upstream and defence sectors. Headquartered in India, Punj Lloyd was an over US$ 1.12 billion organisation with operations spread across the Middle East, the Caspian, Asia Pacific, Africa, South Asia, China and Europe.

 

Atul Punj’s global vision for the Group led him to cross boundaries and establish international offices in 23 countries and gain project experience worldwide. The 8540 strong multicultural workforce underlined his focused approach to harness diversity within the organisation. As many as 37 nationalities formed an integral part of the workforce at the company’s various project locations.

 

It was Atul Punj’s entrepreneurial skills and foresight that resulted in the acquisition of SembCorp E&C in 2006, later called Sembawang Engineers and Constructors Pte. Ltd., one of the largest construction companies of Singapore. His thrust on operations in Singapore resulted in Punj Lloyd winning the India Enterprise Award from the Singapore Indian Chamber of Commerce and Industry for making significant contributions to and a positive impact on Singapore's socio-economic development. Atul Punj was also the first to invest in Global Health’s Medanta, the largest multi-speciality medical institute of India, becoming the harbinger of medical tourism in India. Investments in Airworks saw it grow to become a global business. Atul Punj was the Founder Chairman of Samena Capital, a premier investment group focused on principal investments in the Subcontinent, Asia, Middle East and North Africa (collectively known as the SAMENA region).

 

The corporate social responsibility initiatives resulted in a large volume of work in community enrichment. His focus on Sitamarhi, a backward village in Uttar Pradesh has seen a phenomenal development of the region with villagers having access to quality education, healthcare and other facilities. Dayawanti Punj Model School, a co-educational school affiliated with CBSE, provides quality education to over 1400 children every year. For the economic development of the youth, a vocational training centre was introduced with participation of over 1200 men and women. He was also instrumental in setting up of the ‘Punj Lloyd Institute of Infrastructure’ at the new Indian School of Business (ISB) campus at Mohali, in partnership with MIT, Sloan School of Management. His work on prevention of HIV/AIDS in the vulnerable migrant worker community has earned a lot of goodwill for Punj Lloyd, raising the bar for the living standards of workers, the mainstay of the construction industry.   

 

Atul Punj was awarded the Ernst & Young 'Entrepreneur of the Year 2007' in the Infrastructure & Construction category. CNBC TV 18 conferred the ‘First Generation Entrepreneur of the Year’ award to Atul Punj. Under his focus on quality construction, Punj Lloyd was presented the award for ‘Excellence in Infrastructure’ by the Economic Times in 2014. The Group was globally listed in ENR Ranking of Top 225 International Contractors, Top 225 Global Contractors and Top 200 Design Firms, every year.

 

Atul Punj is based in New Delhi and is actively involved with many trade bodies. With his exhaustive experience of global geographies and energy businesses, Atul Punj was the President of International Pipe Line and Offshore Contractors Association (IPLOCA), headquartered in Switzerland from 2015-2016.

 

Atul Punj enjoys swimming and skiing. A voracious reader, he enjoys non-fiction. 

Civil Construction Projects

S No
Project Name
Client
Description
1
Infrastructure of Zliten, Libya
Housing and Infrastructure Board (MIB)
Designing and construction of the storm water network, water network, telecommunication, power, natural gas, street lighting and road networking including traffic management system and other facilities.
2
Asian Highway
Ministry of Road Transport & Highways
Rehabilitation and upgradation of two and four laning of Bhutan border at Pasakha to Bangladesh border at Changrabandha comprising Jaigaon, Hasimara, Dhupguri section and Mainaguri-Changrabandha section. This contract includes the proposed Pasakha access road of 6.558 km, bypass to Jaigaon and Hasimara in the state of West Bengal, India
3
Upgradation of Gorakhpur -Gopalganj section of NH-28, Bihar, India
National Highways Authority of India
Four laning from 360.915 km to 402.000 km of the Gorakhpur- Gopalganj section of NH-28 in Bihar.
4
Infrastructure of Souk Al Juma, Tripoli, Libya
Housing and Infrastructure Board (HIB)
Engineering, procurement and construction of infrastructure work including sewerage, storm water main and branch lines, roads and other facilities.
5
Sikkim Greenfield Airport
Airports Authority of India
Construction of a high altitude greenfield airport in the foothills of the Himalayas on 1,410 m involving cutting and filling earthwork, geogrid reinforced retaining wall with maximum height 80.38 m, drainage system including box culvert, cascading drains, underground tunnels and aerodrome pavements at Pakyong.
6
Nagpur Capitol Heights
TRIF Real Estate and Development Pvt Ltd
Civil, excavation and other auxiliary work of the integrated residential and retail complex across 10 acres in Nagpur City, Maharashtra and includes four residential towers - two 23 storeyed and two 20 storeyed, along with a retail complex.
7
Infrastructure of Arada Zone, Tripoli, Libya
Housing and Infrastructure Board (HIB)
Engineering, procurement and construction of infrastructure work including gravity sewers, storm sewers, rising mains, roads and other facilities.
8
Railway Siding, Uttar Pradesh
Uttar Pradesh Vidyut Utpadan Nigam Ltd
Earthwork, ground improvement, construction of bridges, workshop building, electrical and other miscellaneous activities.
9
Medical College and Hostel Complex
Ministry of Health and Family Welfare
Construction of medical, dental and nursing colleges, six hostel buildings, warden residence, auditorium, civil work, fire fighting and electrical work at AIIMS, Raipur.
10
Upgradation of Guwahati-Nalbari section of NH-31, East West Corridor, Assam (AS-4)
National Highways Authority of India
Four laning and strengthening of 28 km of NH-31 with flexible pavement including construction of ten minor bridges and 39 culverts.
11
Upgradation of Guwahati-Nalbari section of NH-31, East West Corridor, Assam (AS-5)
National Highways Authority of India
Four laning and strengthening of 28 km of NH-31 with flexible pavement including construction of eight major bridges, 13 minor bridges and 23 culverts
12
Bangalore Metro � Reach 2
Bangalore Metro Rail Corp Ltd
Construction of three elevated Metro Stations viz. Mysore Road Terminal, Deepanjali Nagar and Magadi Road Stations in Reach-2.
13
ASF Insignia IT (SEZ project) Gurgaon, India
Canton Buildwell Pvt Ltd
Civil, structural work and external development for construction of building including three level basement and 17 storeys with built-up area of about 1.15 million sq.ft.
14
Upgradation of Silchar to Balachera section of NH-54, Assam (AS-1)
National Highways Authority of India
Four laning of Silchar to Balachera section from km 306.54 to km 275 of NH-54, construction of flexible pavement, widening of existing two lanes to four lanes, construction of road over bridge, major bridges, minor bridges and culverts, etc.
15
Upgradation of Lanka to Daboka section of NH 54, Assam (AS-16)
National Highways Authority of India
Four laning and strengthening of 23.8 km (including 4.2 km of Daboka bypass) of NH-54 with rigid/flexible pavement including construction of one major, eight minor bridges and 46 culverts.
16
Upgradation of NH- 31 Khagaria to Purnea, Bihar, India
National Highways Authority of India
Upgradation of two lanes, undivided carriageway with paved shoulders. Work entails design build finance, operate and transfer of the 140 km section of the National Highway.
17
Upgradation of Nalbari to Bijni section of NH-31 on East West Corridor, Assam (AS-9)
National Highways Authority of India
Four laning and strengthening of 21.5 km of NH-31 with rigid/ flexible pavement including construction of two major bridges, eight minor bridges and ten culverts.
18
Upgradation of Nalbari to Bijni section of NH-31 on East West Corridor, Assam (AS-8)
National Highways Authority of India
Four laning and strengthening of 30 km of NH-31 with rigid/flexible pavement including construction of two major bridges, eight minor bridges and 22 culverts.
19
Hyderabad Vijayawada section of NH-9
National Highways Authority of India
Four and six laning of Hyderabad-Vijayawada section from km 40 to km 221.5 of NH-9 on BOT (Toll) basis under NHDP Phase-III in the State of Andhra Pradesh.
20
Institute Complex, Rai Bareli
Rajiv Gandhi Institute of Petroleum Technology
The scope of work entails civil, structural and associated work including site development, construction of 27 buildings consisting of administration and library building, auditorium, community centre, lecture halls, commercial centre, staff housing facility, hostels and health care centre over an area of 16 lac sq ft at Rajiv Gandhi Institute of Petroleum Technology in Rai Bareli, UP.
21
Infrastructure of Arada Zone, Tripoli
Housing and Infrastructure Board (HIB), Tripoli, Libya
Engineering, procurement and construction of infrastructure work including gravity sewers, storm sewers, rising mains, roads and other facilities for Arada Zone, Tripoli, Libya.
22
Infrastructure of Souk Al Juma, Tripoli
Housing and Infrastructure Board (HIB), Tripoli, Libya
Engineering, procurement and construction of infrastructure work including sewerage, storm water main and branch lines, roads and other facilities for Souk Al Juma, Tripoli, Libya.
23
Bangalore Metro � Reach 1
Bangalore Metro Rail Corp Ltd
Construction of two elevated Metro stations at MG Road and Trinity Circle Terminals in Reach-1.
24
Parking Facility for Commonwealth Games 2010
Municipal Corporation of Delhi
Covering of two storm water drains totalling 1,979 m in length, on Lodhi Road, Delhi.
25
Upgradation of Lalsot to Kota Road in Rajasthan (LJ-1)
RIDCOR
Widening and strengthening of 189.95 km existing carriageway to two-lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, construction of railway-over bridges, minor/major bridges, user free plazas and associated facilities, construction of bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture.
26
Construction of Elevated Viaduct with stations
Delhi Metro Rail Corp Ltd
Part design and construction of Elevated Viaduct of length 4.784 km, structural work of four elevated stations-Nangloi, Nangloi Rly Station, Rajdhani Park and Mundka on Inderlok-Mundka Corridor of Phase II of Delhi Metro.
27
Upgradation of NH-76, Rajasthan (RJ-8)
National Highways Authority of India
Four laning and strengthening of 65 km of NH-76 with rigid/flexible pavement including construction of 12 minor bridges, 13 under passes and 82 culverts.
28
Medicity Phase-1
Global Health Pvt Ltd
Civil and structural work of multi-speciality medical institute - Medicity. Construction of built up floor area of 20,000 m2 comprising a 21 storeyed OPD block, two 18 storeyed IPD Blocks, nine storied OT block and seven storeyed admin and night lounge blocks at Sector 38, Gurgaon.
29
Upgradation of Ratangarh to Kishangarh Road in Rajasthan (HK-2)
RIDCOR
Widening and strengthening of 206.5 km existing carriageway to two lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture.
30
Upgradation of Hanumangarh to Ratangarh Road in Rajasthan (HK-1)
RIDCOR
Widening and strengthening of 200 km existing carriageway to twolane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/ major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture.
31
Upgradation of Baran to Jhalawar Road in Rajasthan (LJ-2)
RIDCOR
Widening and strengthening of 77.26 km existing carriageway to two-lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture.
32
Upgradation of Mohania- Sasaram Section of NH-2, Bihar
L G Engineering and Construction Corp/Inter- Continental Consultant and Technocrats
Four laning and strengthening of NH-2 from Mohania to Sasaram, (45 km long) from two lane highway to four-lane. New concrete pavement including 11 RCC bridges, six pre-stressed bridges, 57 culverts and one syphon.
33
Construction of Jaipur Bypass Zone D, Rajastha
National Highways Authority of India/ Meritec Ltd
Construction of access controlled four-lane divided carriageway with six lane structures, 34.7 km long, connecting NH-8 at Chandwaji and NH-11 at Harmara, including a 30.9 km service road, two flyovers, 11 underpasses, 39 culverts and arboriculture.
34
Upgradation of Gowthami- Diwancheru Section of NH-5, Andhra Pradesh
National Highways Authority of India/ SNC Lavalin Inc.
Widening and strengthening of existing two lane carriageway to four lanes from Gowthami bridge to Diwancheru section (chainage 164.50 km to 200 km), including construction of one bridge, 71 culverts and arboriculture.
35
Elevated Viaduct from Barakhamba Road Connaught Place for Line No. 3
Delhi Metro Rail Corp Ltd
Construction of elevated structures - viaducts and ramp (chainage 8.00 km to 14.30 km) from Kirti Nagar to Tilak Nagar section for Line No. 3, including construction of piles, substructure, pre-stressed segmental construction of superstructure and overhead electric line masts at Delhi.
36
Upgradation of Dharmavaram- Tuni Section of NH-5, Andhra Pradesh
National Highways Authority of India/ Zaidum Leeng, Malaysia and Artefact Project India (Joint Venture)
Design engineering and construction for strengthening and widening of NH-5 from Dharmavaram to Tuni (chainage 253 km to 300 km) from the existing two lanes to four lanes, widening of the existing structure to six lanes, including the construction of the 6.72 km new alignment, 9 km service road, five grade separators, 11 bridges, one road overbridge, eight underpasses and 149 culverts.
37
Upgradation of Rajahmundry- Dharmavaram Section of NH-5, Andhra Pradesh
National Highways Authority of India/ Zaidum Leeng, Malaysia and Artefact Project India (Joint Venture)
Design engineering and construction for strengthening and widening of NH-5 from Rajahmundry to Dharmavaram (chainage 200 km to 253 km) from two lanes to four lanes and widening of existing structures to accommodate six lanes, including the construction of the 7.97 km new alignment, service road, four bridges, five underpasses, culverts, 12-lane toll plaza and one maintenance yard.
38
Upgradation of Belgaum- Maharashtra Border Section of NH-4, Karnataka
National Highways Authority of India/ Frischmann Prabhu (India) Pvt Ltd
Design engineering and construction for strengthening and widening of NH-4 from Belgaum to Maharashtra border (chainage 515 km to 592 km) from existing two lanes to four-/six lanes, including 5 km bypass and 142 km of service road, widening of structures to four/six lanes construction of seven grade separators, 22 bridges, one subway, 19 cattle walks/cart tracks, four underpasses and 124 culverts, six vehicular underpasses, arboriculture and illumination of highway. Excavation � Earthwork in filling � 4,000,000 m3 � Earthwork in cutting (soil) � 800,000 m3 � Earthwork in cutting (rock) � 850,000 m3 Concrete � Pre-stressed concrete � 5,000 m3 � DLC+PQC � pavement concrete � 40,000 m3 � Concrete in other structures � 200,000 m3 Steel � Reinforcing steel � 12,500 MT � Pre-stressing steel � 250 MT
39
Upgradation of Nasirabad- Gulabpura Section of NH-79, Rajasthan
National Highways Authority of India/ Sverdrup Civil Inc., New Delhi
Four laning and strengthening of NH-79 from Nasirabad to Gulabpura (chainage 15 km to 70 km) section, including the construction of a service road, one road overbridge, ten bridges, 60 pipe culverts and arboriculture.
40
Infrastructure and Services to Dukhan Support Services, Qatar
Voltage Engineering Ltd/ Qatar Petroleum
Engineering, procurement, construction, installation and commissioning of infrastructure and services, including testing, pre-commissioning and assistance in commissioning for fire water system, fire hydrant pumping station, foul sewerage system, potable water supply system, surface water drainage system, storage tank and road network
41
Earthwork construction, Area 10 and 11, Central Duri, Riau, Indonesia
PT Caltex Pacific Indonesia
Development of producer/injection well pad locations in Area-10 of Duri Steam flood area construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs.
42
Development of Bawana Industrial Park
Delhi State Industrial Dev. Corp Ltd (DSIDC)/ RITES
Construction of new industrial park for relocation of industries, including construction of internal roads, parking lots, water supply system, waste water system, storm water drainage and fire-fighting network in Delhi
43
Road Overbridge for Karur Bypass
National Highways Authority of India Ltd/RITES
Four lane 842 m long road overbridge in lieu of level crossing near Karur, on NH-7, including 32 T-beam slabs each 17.5 m long, four pre-stressed obligatory spans 25.10 m long, two pre-stressed rail spans 25.5 m and RCC retaining walls 784 m long.
44
Earthwork construction, Area 10, Duri, Riau, Indonesia
PT Caltex Pacific Indonesia
Development of producer/injection well pad locations in Area-10 of Duri steam flood area and construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs.
45
Earthwork construction, Area 10, Duri, Riau, Indonesia
PT. Caltex Pacific Indonesia
Development of producer/injection well pad locations in Area-10 of Duri steam flood area and construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs.
46
Noida- Greater Noida Expressway
IRCON International Ltd
Construction of expressway up to WMM level between Noida and Greater Noida-Phase I (km+000 to 3+500).
47
Bawana Water Treatment Plant
Municipal Corp of Delhi
Construction of 91 mld capacity water treatment plant at Bawana, involving: � Construction of 3 Nos. clear water reservoirs of 61 m x 61 m and 3.6 m ht � Clarifloculator: 4 Nos. dia 33.5 m � Filter house, chemical house, sludge sumps, pump house, administrative building, annexe building, filter house and associated road work
48
Emergency Water Reservoir
Dabhol Power Co/TCE Consulting Engineers Ltd
Engineering, procurement and construction of reservoir of 120,000 m3 capacity at Dabhol, Maharashtra
49
Tank Excavation and Construction of Alternate Road
Metropolis Gas Co. Pvt Ltd
Excavation for Tank T-100 and construction of alternate road at Dabhol, Maharashtra: � Earthwork � 49,000 m3 � Hard rock (by blasting) � 100,000 m3
50
LNG Storage and Regasification Terminal
Skanska Cementation International Ltd/ Enron, USA
Earthwork (roads, tanks and drainage) � Excavation in soil: 530,000 m3 � Excavation in rock: 320,000 m3 � Filling: with soil: 290,500 m3 with rock: 316,500 m3 with select and graded material: 22,500 m3 Concrete Work � Pre-stressed concrete in tank outer wall base and ring beam: 27,000 m3 � Reinforced concrete in all structures except tanks: 19,855 m3 � Cryogenic concrete: 1,200 m3 � Rebar: 3,000 MT � Cryogenic rebar: 1,372 MT � Pre-stressed tendons: 1,800 MT � Grouting cement for pre-stressing work: 1,800 MT Structural Steel Fabrication 8,900 MT The above civil work were part of a project for the construction of 3 Nos. 160,000 m3 (79.2 m dia x 54 m ht), LNG tanks, pipework, insulation application, painting, electrical and instrumentation work, fire-fighting system, equipment erection, including unloading arms installation and commissioning assistance for LNG Storage and Regasification Terminal at Dabhol, Maharashtra.
51
Vadodara-Halol Tollway
Vadodara-Halol Toll Road Ltd
Construction of 32 km four-lane tollway from Vadodara to Halol, including toll operation and asset maintenance for a period of 30 years.
52
Peeragarhi Flyover
U P State Bridge Corp Ltd
Construction of 220 Nos. (1,200 mm dia) bored cast-in-situ piles (total length 3,750 rm) and pile capping work of 2,480 m3 in New Delhi.
53
Soda Ash Plant
Nirma Ltd
Construction of 4,341 Nos. driven cast-in-situ piles, civil work, including tunnels, silos, sumps water retaining, structural steel work, road and other development work at Kala Talav, Bhavnagar.
54
Raja Garden Flyover
U P State Bridge Corp Ltd
Installation of 11,000 rm (1,200 mm dia) bored piles and pile capping work (concrete 13,000 m3) for construction of grade separator at intersection of Ring road and Najafgarh Road, New Delhi
55
Raw Water System
Reliance Industries and Infrastructure Ltd
Installation of 11,000 rm (1,200 mm dia) bored piles and pile capping work (concrete 13,000 m3) for construction of grade separator at intersection of Ring road and Najafgarh Road, New Delhi.
56
Effluent Treatment Plant
Oil and Natural Gas Corp Ltd
Design, engineering, supply, erection and commissioning of 4,000 m3 per day effluent treatment plant at North Santhal.
57
Raw Water Intake System
Chambal Fertilisers and Chemicals Ltd
Design, procurement, erection and commissioning of raw water system comprising approach bridge, intake well, tunnel, pumping station and (24� dia) 7 km pipeline for Gadepan plant.
58
DM Water Plant
Chambal Fertilisers and Chemicals Ltd/ Toyo Engineering India Ltd
Civil work for DM Water Plant at Gadepan.
59
Sewerage and Storm Water System
DLF Builders and Developers Ltd
Development work, including overhead and underground tanks, sewerage system and storm water drains at Qutab Enclave, Gurgaon.
60
Jet Engine Test Bed and Repair Facility
Indian Airlines/ General Electric Technical Services Co Incs, USA
Design, procurement and erection of total facility on turnkey basis, covering civil and mechanical work, airconditioning system, electrification, instrumentation and acoustics at IGI Airport, New Delhi
61
Aero Engine Test Bed Facility
Commander Work Engineers (Projects), Kanpur
Complete modification, including design/engineering of test cell and ejectors for test bed facility, along with acoustic insulation at Kanpur.
62
Aero Engine Test Bed Facility
Hindustan Aeronautics Ltd
Fabrication, erection of steel structures and augmentors, including testing and commissioning of aero engine test bed facility at Koraput, Orissa.
63
Aviation Fuelling Complex
Bharat Petroleum Corp Ltd/Dalal Consultants
Mechanical erection of piping and equipment, along with associated civil work for Aviation Fuelling Complex at IGI Airport, New Delhi.
64
Foldable Acoustic Partition
Delhi Development Authority
Design, fabrication, erection and commissioning of 55 m foldable acoustic partition for indoor stadium.

List Title

1 / Item Title

Describe the item and include any relevant details. Click to edit the text.

2 / Item Title

Describe the item and include any relevant details. Click to edit the text.

3 / Item Title

Describe the item and include any relevant details. Click to edit the text.

© 2023 by Fort Infraventure Pvt Ltd. All rights reserved.

bottom of page